Go Green
 

 
 

Follow Us On Twitter    Become A Fan On Facebook    Visit Our Instagram Page   Network With Us on LinkedIn    Subscribe To Our News Alerts


Go Green Pledge

Download Go Green Widget

Download Go Green News Ticker


Hosted on Green Server Hosted on Green Server
Go Green An Ekotribe Initiative

Green Stories
Change text size:
London Olympics - Going for Green
Send  your comments Send your comments Green Stories

London Olympics - Going for Green

Sponsored Sites
Shop Online for
Eco-Friendly Products
Ekotribe
Carbon Consulting

The London Olympics infrastructure has been built in the most sustainable way possible.

Here are some facts that helped the organising committee achieve their objectives:

Work is well underway to create around 250 acres of new parklands, on former industrial land, that will provide a colourful and festival atmosphere for the London 2012 Games and afterwards become the largest new urban park in the UK for over 100 years.

The first of 4,000 new semi-mature trees are taking root in the Olympic Park and Olympic Village, in what is thought will be the largest one-off planting of its kind in the capital.

New habitats for species including: otter; kingfisher; grey heron; bee; house sparrow; bat; song thrush; starling; toadflax brocade moth; lizard; black redstart; flower and fungus beetle; frogs, newts and toads; eel; water vole; slow worm; grass snake; linnet; sand martin; swift; and invertebrates.

Five soil-washing machines have successfully completed cleaning most of the one million cubic metres of soil contaminated with oil, petrol, tar, cyanide, arsenic and lead.

More than 220 buildings demolished with 98 per cent of the materials by weight recycled, well over the 90 per cent target.

Over 5km of riverbanks replaced or refurbished and 30,000 tonnes of silt, gravel and other materials dredged from the rivers.

The Velodome has a 6,000 capacity in Games-time and Legacy – 3,500 around the track and 2,500 in upper tiers suspended within the curves of the roof.

Curved steel structure made up of more than 2,500 sections of steelwork. Shape is designed to reflect the geometry of the cycling track, rising in height by 12m from shallowest point to the highest.

At 30kg/m2, roof weighs roughly half that of any other covered Velodrome. 
 












 
 
How To Reduce Your Carbon Footprint?
Click here to request a copy of How To Reduce Your Carbon Footprint?
Green Speak
Click here to request a copy of useful Eco Jargon.
Some non green numbers from Go Green
Click here to request a copy of Non Green Numbers by Go Green.
10 Ways to Go Green
Click here to request a copy of 10 Practical Ways to Go Green.
Facts About Global Warming
Click here to request a copy of Facts About Global Warming.
Top 10 Reasons to Recycle
Click here to request a copy of Top 10 Reasons to Recycle.
Carbon Neutrality, Carbon Emissions and Carbon Offsets
Click here to request a copy of Carbon Neutrality, Carbon Emissions and Carbon Offsets.
Go Green at Work
Click here to request a copy of How To Go Green at Work?
Go Green at Home
Click here to request a copy of How To Go Green at Home?
The Power of the sun - Glossary of solar terms
Click here to request a copy of The Power of the sun - Glossary of solar terms.
The Carbon Lexicon - Reduction in emissions of carbon or greenhouse gases
Click here to request a copy of The Carbon Lexicon - Reduction in emissions of carbon or greenhouse gases.
Carbon Emission Stats - Per Country, Per Capita
Click here to request a copy of Carbon Emission Stats - Per Country, Per Capita.
We accept guest posts.
Link to Us Tell A Friend Subscribe to News Alerts


advertise-with-us
 

Go-Green.ae has 2,043 Green Stories, 147 Green Product Reviews, 7070 Green News Headlines , 386 Organisations in the Green Directory, 391 Green Book Reviews, 479 Green Videos, 205 Green Tips and 1696 Go Green Ambassadors in 116 countries.
Green Resources
Another Cyber Gear Site